Lantana Airport – Southside Redevelopment Program Phase 1 & 2

The project consisted of the design and construction of a new 10,000 sqft hangar building. The scope of work included the design of a pre-fabricated metal building, foundations and slab on grade. Also, the construction of the masonry partitions, insulated metal roof and wall panels, fiberglass doors and frames, hydraulic hangar doors, gypsum board, exterior and interior painting, fire extinguishers, precast concrete building and toilet accessories.

Project Relevance

Lantana Airport is a reliever airport focusing on general aviation reciprocating and turbine driven aircraft.

 

Contact Us:


CORPORATE OFFICE: 5337 Orange Drive, Davie, FL 33314

JUPITER OFFICE: 1662 North U.S Highway 1, Jupiter, FL 33469

FORT PIERCE OFFICE: 6127 Orange Ave, Fort Pierce, FL 34947

PHONE: (954) 252-1372

 

Reach Out To Us: