Port Everglades Drainage Improvements PH I
Design/Build project that included the relocation of an existing stormwater out fall conveyance which serve the 18.5 Acre/Seaport. Installation of new 370 lnft of 48″ drainage precast concrete pipe and drainage structures. Resettle of over 2000 cuyd of existing berm and all other removed facilities (stairs, wells, grounding box, fence, etc.). Furthermore, the scope of the work required the design/build of replacing an existing diesel powered pump station complete with new concrete pad, selective demolition, roadway construction, earthwork, painting, mechanical, electrical, auger cast piles, etc. This project required the excavation of existing soils next to existing underground fuel lines.
Port Everglades was ranked the 3rd busiest cruise home port in the world and also the busiest container port in Florida. Port Everglades is currently the deepest port in the United States. (update if needed)
Project Features
Nulla pretium faucibus neque at venenatis. Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Interdum et malesuada fames ac ante ipsum primis in faucibus.
Nulla sed viverra tellus.
In elit diam, convallis vitae massa eu, pharetra venenatis turpis. Nullam viverra pharetra nulla, at posuere ante dictum in.
Contact Us:
CORPORATE OFFICE: 5337 Orange Drive, Davie, FL 33314
JUPITER OFFICE: 1662 North U.S Highway 1, Jupiter, FL 33469
FORT PIERCE OFFICE: 6127 Orange Ave, Fort Pierce, FL 34947
PHONE: (954) 252-1372